Who We Are

Overview
KAHROMIKA is the leader contractor for electro-mechanical projects with an impressive track record of construction growth. We continuously strive to provide appropriate solutions to our clients conforming to international quality standards.

Our major activities are in the fields of :

Power generation plants ( thermal, combined cycle, super critical, gas & diesel ).
Substations up to 500 kV ( GIS & conventional ).
Overhead transmission lines up to 500 kV.
Control centers.
HV Cables.
MV & LV distribution.
Pumping stations.
Wind Farms.
Industrial projects ( sugar, cement, paper, chemical, petroleum & refinery, fertilization plants  .. etc. ).
Water and sewage treatment.
Steel fabrication.

History

KAHROMIKA established in 1971 as a public sector affiliated to the Egyptian Ministry of Electricity and Energy. In 1997 KAHROMIKA became a private company where AIC Construction Co. acquired the majority share.

 KAHROMIKA established some branches in different countries in Africa ( Libya, & Algeria ) and Asia ( Kuwait, Dubai & Qatar ) and installed a gas power plant in Oman.
 To empower KAHROMIKA, a group of profoundly competent engineers, were selected to manage the company. Those originators had attained their extensive experiences,through their work in the construction of Aswan High Dam.
 By 1975, KAHROMIKA became capable to undertake execution of projects of major importance to the power sector such as Kafr El Dawar thermal power plant ( 4x110mw. Units) this project the actual start of KAHROMIKA's power generation activities.
 Later KAHROMIKA became the major Electro-Mechanical contractor in Egypt, through its extensive participation to most of the projects in the power generation and distribution,having at present a primary role in the construction of El Kureimat (2x600 MW), Ayoun Mousa ( 2x325 mw.)Power stations and Egypt Boot #1 Sidi Krir power plant, units 3,4(2 x 325 mw) Mechanical steam turbine generator, condenser, piping, Boiler installation and steel structure erection. Recently, KAHROMIKA has been installing Nubaria Power Station I&II 2X750 MW Combined Cycle projects :
*    Steam Turbine Generator and Auxiliaries.
*Mechanical equipment / pipe installation.
*    Electrical equipment / instrument installation.
*    500 kv conventional air insulated switchyard.
 Also KAHROMIKA has been installing Cairo North Power Station I&II 2X750 MW Combined Cycle Project :
*    Mechanical equipment/pipe installation.
*    Steam Turbine generator & Auxiliaries II.
 KAHROMIKA has a wide experience in control centers field such as National Energy Control Center ( NECC ), Cairo Regional Control Center ( CRCC ). KAHROMIKA is also a leader in power distribution systems and has successfully fulfilled projects of high magnitude for :
*    500/220/66/11 KV Substations.
*Extra / high voltage transmission lines.
*    Installation of optical ground wire OPGW and ADSS cables
*    on a life 220KV and 66 KV transmission lines.
*    Control Centers.
*    High / Medium Voltage cable projects.
*    Medium and low voltage networks projects for the new cities.
 In 1990 KAHROMIKA was ready to export its experience abroad and was awarded important racts in Algeria, Libya, Kuwait, Qatar, Dubai and Sudan.
 It is part of KAHROMIKA's strategy and vocation to strengthen its presence in the Middle East and Africa, generally to be an international contractor.
With the privatization, a new boost was given to the company's potentialities, to meet the requirements and expectations, and to merit the satisfaction of its customers. The new management is committed to continuously improve the quality of the services provided, as being the only way to maintain the superior position of KAHROMIKA's business.
 To achieve this KAHROMIKA establishes and implements the following:
Quality assurance system that conforms with ISO 9001 requirements.
*    ASME Stamps :
*A- Assembly of Power Boilers.
*    PP- Pressure Piping.
*    Continuous training program for the staff.
*    Modern project management system that enables the control of the projects in real time, giving first priority to the quality of the works, the compliance with the specification,and the execution within the required time-frame.