Maryah Plaza, Abu Dhabi, UAE
KEO’s Design team stayed faithful to that original design while changing the primary material of the structure from steel to reinforced concrete,
increasing the number of units, and creating a more practical building finish, in order to keep costs competitive.
The scope of work included conducting a constructability review of the completed landscape design package and providing
a final set of construction drawings based off the client’s feedback and changes made to the structure.
KEO ensured that the design meets all local code requirements. Three other towers are also part of the overall development,
and KEO may provide design and supervision services for each of them in the future.
Please Login to Post a Comment
Login Register